Services · LGS Roofing
We don't just supply steel. We engineer, fabricate, transport, install and inspect the finished roof.
Request a Roof AssessmentThe process
Span and load calculation matched to your specific roof geometry before anything is fabricated.
Truss and purlin layout drawn to fit the actual structure.
Gauge, grade and coating chosen for span and site conditions.
C-channels and purlins formed off-site under controlled conditions.
Trusses pre-assembled at ground level where the project allows, reducing at-height work.
Components moved to site in the order the install schedule needs.
On-site fastening and erection by a dedicated crew.
A supervisor stays on site through install.
The finished roof is inspected against the original design before handover.

Case study
Material
We specify G550 high-tensile galvanized steel, among the strongest cold-formed steel grades available, for our LGS structures and roofing, and we're working to establish it as the standard for LGS construction in Nigeria.
We're finalizing supplier mill certification for this specification. Happy to share documentation on request.
Private homes and estate housing, from single residences to multi-unit roofing contracts.
Roof structures for commercial buildings where span and programme matter.
Long-span roofing for industrial and storage buildings.
Example: the NITP Secretariat, Wuse Zone 5, a hybrid roof of hot-rolled I-beam primaries and LGS secondary trusses.
Tell us the site and the roof. We'll come back with a technical assessment.
Request a Roof Assessment